Current Projects

All Projects / Current Projects / Construction / Design / Studies
Current Construction Projects
Front Beach Road Segment 1 / South Thomas Dr. Reconstruction |
|||||
Project Documentation |
|||||
|
|
|
|
|
|
Front Beach Road Segment 2 / South Thomas Dr. to Richard Jackson Blvd. Reconstruction |
|||
Project Documentation |
|||
![]() Intersection and Mid-Block Crossing Design |
![]() Landscape Plan |
||
Current Design Projects
SR 79, Front Beach Rd. to PCB Pkwy. / SR 79 to Lullwater Dr. |
Current Studies
Front Beach Rd. Preliminary Design & Engineering |
|||||
![]() FBR Public Hearing Meeting Packet – Aerial Map |
![]() FBR Public Hearing Meeting Packet – Newspaper Ad |
![]() FBR Public Hearing Meeting Packet – Concept Plans Large File: 49.2MB |
![]() FBR Type 2 Final Draft Large File: 178MB |
![]() FBR Public Hearing Media Coverage |
![]() Approved PD&E Study |













